Nanjing Pan-F Survey Engineering Co., Ltd.



Company news

Successful Completion of Survey Project for Matadi Port Phase II in DRC

Date:2024-05-30

From November 2020 to January 2021, at the peak of rainfall in the rainy season of the DRC, our company carried out the investigation project of Matadi Port Phase II of the DRC. The deepest water of the river reaches 25 meters, the current is turbulent, and the bottom of the river encounters rocks in 1 meter, which makes it difficult to locate the underwater position, difficult to lower the casing, etc. Overcoming the above unfavorable factors, our company has successfully completed the drilling work in the water, and compiled the engineering investigation report in accordance with the British specification of the investigation, which passed the evaluation of the foreign side successfully.

image.png